Newsletter

SERINUS ENERGY INC. Natrafienie na liczne strefy gazowe w odwiercie Olgowskoje-11 na Ukrainie

03.06.2014, 15:29aktualizacja: 03.06.2014, 15:29

Pobierz materiał i Publikuj za darmo

Current report No: 27/2014

Current Report No. 27/2014

Date: 2014-05-06

Issuer'strading name: SERINUS ENERGY INC.

Title: Ukraine: Olgovskoye -11 Finds Multiple Gas Zones

Legal basis: other regulations

Content:Pursuant to Article 62.8 of the Act of 29 July 2005on Public Offering [...] the Management of SERINUS ENERGY INC. ("Serinus" or the "Company") informs that in Canada via the SEDAR system it has published information that the Olgovskoye-11 ("O-11") development well has been drilled to its total depth ("TD") of 3,230 meters. Logging is now complete and has identified net pay in four zones of Bashkirian or Serpukhovian age, three of which have been established as productive within the Company's Ukrainian Licences. The operator, KUB-Gas LLC has set production casing and a testing programme will begin once the workover rig currently on the Makeevskoye 17 ("M-17") well finishes its operations there. The drilling rig will now move from O-11 to the North Makeevskoye-4 location to test a seismically-identified stratigraphic play. Drilling is expected to commence by the end of June.

The O 11 well was drilled as a step out location from the O 9 well withrespect to the Bashkirian R30c zone, and to appraise the gas discovery made in the S6 sandstone in O-15. It is located about 1 kilometre to the south of O-15 within the same structural closure. Drilling commenced in early April 2014 and reached TD on May 18th. Cores were cut in both the R30c and S6.

Summary Log Results for O-11R30c zone - Bashkirian formation - NetPay 15 metresR8b zone - Bashkirian formation - Net Pay 2.5 metresS6 zone - Serpukhovian formation - Net Pay 8 metresS7 zone - Serpukhovian formation - Net Pay 5 metres

The two primary targets are the R30c and S6 zones.

R30c - Preliminary inspection of the core from the R30c indicatesthat it is a fine grained sandstone with minor shale laminations, similar to that found in the O 15 and O 6 wells. Initially, the R-30c zone in O 6 was not capable of commercial flow rates, but commenced production in early 2012 at 1.5 MMcf/d after being stimulated. No gas-water contact is seen in the R-30c in O-11, and the Company anticipates no issues in stimulating it as well.

S6 - Initial inspection of the core from the S6 sandstoneindicates a clean sand with no observed gas-water contact, similar to the S-6 in O 15.which commenced production in August 2013 at an initial rate of 1.7 MMcf/d, and did not require stimulation.

The B8b and S7 zones are secondary targets, and logs indicate potentialpay in both formations. Testing will be required on both zones to confirm this potential

Olgovskoye is Serinus' second largest producing field at 12.4 MMcf/d(8.7 MMcf/d net to Serinus 70% WI) from 10 wells. Most of the production is from Bashkirian aged sandstones, and with the success in the Serpukhovian in both O-15 and O 11, the Company's future exploration and development efforts will include that deeper section as well.

This text contains selected excerpts from the original news release inEnglish, which has been filed by Company in Canada (country of its registered office ) by way of the SEDAR system and is available at the website www.sedar.com by entering the Company name at http://www.sedar.com/search/search_form_pc_en.htm. The Polish translation of the entire text of the news release is available at the website: www.serinusenergy.com

More information on page: biznes.pap.pl

kom espi pif/

Pobierz materiał i Publikuj za darmo

bezpośredni link do materiału
Data publikacji 03.06.2014, 15:29
Źródło informacji ESPI
Zastrzeżenie Za materiał opublikowany w serwisie PAP MediaRoom odpowiedzialność ponosi – z zastrzeżeniem postanowień art. 42 ust. 2 ustawy prawo prasowe – jego nadawca, wskazany każdorazowo jako „źródło informacji”. Informacje podpisane źródłem „PAP MediaRoom” są opracowywane przez dziennikarzy PAP we współpracy z firmami lub instytucjami – w ramach umów na obsługę medialną. Wszystkie materiały opublikowane w serwisie PAP MediaRoom mogą być bezpłatnie wykorzystywane przez media.

Newsletter

Newsletter portalu PAP MediaRoom to przesyłane do odbiorców raz dziennie zestawienie informacji prasowych, komunikatów instytucji oraz artykułów dziennikarskich, które zostały opublikowane na portalu danego dnia.

ZAPISZ SIĘ